Normal turnaround
24hrs
Price
From drawings or survey information
1week
Survey
From order
60min
Drawings
Calculations and CAD from survey
Sameday
RAMS
Written for the job and site
2–4wks
Install
From order, faster when urgent
The process
Step by step.
Supply only, install only, or supply and install.
-
01
Enquiry
Registered the same day with a job reference.
What you receive
Job reference and what we need to price
-
02
Quote
Clear pricing, options and scope.
What you receive
Quotation and agreed scope
-
03
Order
Acknowledged, job set up, shared folder created.
What you receive
Order acknowledgement and project folder
-
04
Survey
We measure, sketch and photograph the route.
What you receive
Survey information and confirmed interfaces
-
05
Calculations and drawings
Normally back within 60 minutes of survey.
What you receive
Calculations, CAD drawings and technical submittals
-
06
RAMS
Written for the job and site, normally same day.
What you receive
Job-specific risk assessment and method statement
-
07
Materials and logistics
Materials and access lined up with the programme.
What you receive
Programme and logistics information
-
08
Installation
Trained engineers, daily pre-start checks. Every job has a Grün project manager on site.
What you receive
Installation records and site checks
-
09
Progress reports
Daily reports with photographs.
What you receive
Daily photo report
-
10
Testing and sign-off
Pressure, smoke or CCTV testing as the job needs.
What you receive
Test reports and certificate of conformity, as applicable
-
11
Handover
In your project folder, normally before the engineers get home.
What you receive
Completion report, photographs and O&M pack
On site
Trained for the site.
Matched to the role and the site.
- CSCS
- IPAF
- PASMA
- SSSTS
- Asbestos awareness
- DBS where needed
Start with step one.
Price normally within 24 hours.