Stainless twin wall flue running at high level under a roof with yellow steelwork, cable trays and ductwork
All projects
Boiler flue GE1544

Visitor attraction

Birmingham, boiler flue

Type
Boiler flue
Location
Birmingham, West Midlands
Status
Complete
System
Twin wall insulated flue

The job

A long high level run in a busy plant room.

We designed, supplied and installed a new boiler flue at a visitor attraction in Birmingham.

Three modular gas boilers connect into a shared Ø180 twin wall header. The run includes about 12 metres of horizontal flue at high level, threaded between the roof steelwork, ductwork and cable trays.

The flue then rises about 8 metres. Every section is hung from drop rods and brackets.

3

boilers on one Ø180 header

12m

approximate horizontal run

On site.

Site photographs. Tap a photo to see it larger.

Visitor attraction, Birmingham, boiler flue. The high level run through the plant room roof space.
Visitor attraction, Birmingham, boiler flue. A bend held on a drop rod bracket.

Scope

What we delivered.

  • Flue design
  • Twin wall insulated header, Ø180
  • Drop rod supports through the roof steelwork
  • Stack rising about 8 metres

Project details

  • Boiler flue
  • West Midlands
  • Design, supply and install
Similar workBoiler flues

Got a job like this?

Price normally within 24 hours of drawings or survey information.

Send drawings Get a price