Stainless twin wall flue stack with a mesh terminal on a school flat roof, braced to the upstand with strut
All projects
Boiler flue GE1643

The Vaynor First School

Redditch, boiler flue

Type
Boiler flue
Location
Redditch, West Midlands
Status
Complete
System
Twin wall insulated flue

The job

Three boilers and a clean roof finish.

We designed, supplied and installed a new boiler flue at The Vaynor First School in Redditch.

Three 110kW gas boilers connect into a Ø150 twin wall insulated header. The header runs about 4 metres, then rises about 6 metres through the roof.

Inside, the riser sits on a base tee with a drain and is held on strut fixed to the wall. On the roof, the stack has a mesh terminal and a strut bracket back to the upstand.

3 × 110kW

boilers on one header

6m

approximate stack height

On site.

Site photographs. Tap a photo to see it larger.

The Vaynor First School, Redditch, boiler flue. The stack on the flat roof, braced back to the upstand.
The Vaynor First School, Redditch, boiler flue. The base tee and riser in the plant room.

Scope

What we delivered.

  • Flue design
  • Ø150 twin wall insulated header
  • Base tee with drain and strut supports
  • Roof terminal with mesh and stay bracket

Project details

  • Boiler flue
  • West Midlands
  • Design, supply and install