- Type
- Chimney liner
- Location
- Birmingham, West Midlands
- Status
- Complete
- System
- Twin wall header, single wall liner
The job
A new header and a liner up the old chimney.
We designed, supplied and installed the boiler flue at Summerhill House in Birmingham.
Three 176kW boilers connect with Ø150 primaries into a Ø350 twin wall insulated header, which runs about 7 metres through a crowded basement plant room.
From there a Ø350 fully welded single wall liner rises about 14 metres inside the existing chimney stack.
3 × 176kW
boilers on one header
14m
liner up the existing chimney
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Flue design
- Ø350 twin wall insulated header
- Ø350 single wall liner in the existing chimney
- Header supports through the plant room
Project details
- Chimney liner
- West Midlands
- Design, supply and install
Got a job like this?