Stainless exhaust terminal with a mesh guard on a wall plate in a new red brick wall beside a louvred door
All projects
Generator exhaust GE2548

Tower Works

Leeds, generator exhaust

Type
Generator exhaust
Location
Leeds, Yorkshire
Status
Complete
System
Insulated twin wall exhaust

The job

A generator exhaust out through a brick wall.

We designed, supplied and installed the exhaust flue for a 275kVA standby generator at Tower Works in Leeds in May 2023.

The insulated twin wall flue, Ø150 inside, runs about 19 metres at high level across the generator room on strut supports.

It leaves the building through the brick face on a wall plate and finishes with an angled mesh terminal.

275kVA

standby generator

19m

approximate horizontal run

On site.

Site photographs. Tap a photo to see it larger.

Tower Works, Leeds, generator exhaust. The exhaust terminal on the brick face.
Tower Works, Leeds, generator exhaust. The exhaust run across the generator room.
Tower Works, Leeds, generator exhaust. The angled terminal from the side.

Scope

What we delivered.

  • Site survey
  • Calculations and CAD drawing
  • Job specific RAMS
  • Insulated twin wall exhaust, Ø150
  • Strut supports at high level
  • Wall plate and angled mesh terminal
  • Certificate of conformity and O&M documents

Project details

  • Generator exhaust
  • Yorkshire
  • Design, supply and install
Similar workGenerator exhausts and silencers

Got a job like this?

Price normally within 24 hours of drawings or survey information.

Send drawings Get a price