Boiler flue GE2850

Lever Edge Care Home

Bolton, boiler flue

Type
Boiler flue
Location
Bolton, North West
Status
Complete
System
Twin wall insulated flue

The job

A boiler flue up the wall of a care home.

We designed, supplied and installed a new boiler flue at a care home in Bolton.

Four 60kW boilers connect through Ø80 primary flues into a shared header. The header leaves the plant room through the old louvre opening, which we removed and made good around the flue.

Outside, a twin wall insulated flue rises about 6.5 metres up the brick wall, offsets past the eaves and finishes above the roof line. The work was done from scaffold.

4 × 60kW

boilers on one header

6.5m

external riser

On site.

Site and survey photographs. Tap a photo to see it larger.

Lever Edge Care Home, Bolton, boiler flue. The finished flue running up past the eaves.
Lever Edge Care Home, Bolton, boiler flue. The riser leaving the plant room and climbing the wall.
Survey photo. Lever Edge Care Home, Bolton, boiler flue. Survey photo: the wall and louvre before the work.

Scope

What we delivered.

  • Site survey
  • Flue calculations and CAD drawing
  • Job specific RAMS
  • Primary flues and shared header
  • Twin wall riser up the outside wall to above the roof
  • Worked from scaffold
  • Certificate of conformity and O&M documents

Project details

  • Boiler flue
  • North West
  • Design, supply and install