Stainless steel generator exhaust stack rising from a silencer on top of an acoustic enclosure
All projects
Generator exhaust GE3094

Preston Hospital

Preston, generator exhaust

Type
Generator exhaust
Location
Preston, North West
Status
Complete
System
Twin wall insulated exhaust

The job

One generator, one stack.

A new exhaust for a single generator at Preston Hospital.

The stack rises from the silencer on top of the generator's acoustic enclosure.

We surveyed it, drew the route and installed it with our own supports and fixings.

1

generator

Ø350

twin wall insulated exhaust

5.15 m

stack height

On site.

Site photographs. Tap a photo to see it larger.

Preston Hospital, Preston, generator exhaust. Exhaust stack rising from the silencer on the acoustic enclosure.

Scope

What we delivered.

  • Site survey
  • CAD drawing of the route
  • Ø350 twin wall insulated exhaust with a 90° elbow
  • strut channel supports and fixings
  • Our own access up to 2.5 m working height
  • Certificate of conformity

Own access

We brought our own access.

Access up to 2.5 m working height was provided by us.

Project details

  • Generator exhaust
  • North West
  • Supply and install
  • Own access
Similar workGenerator exhausts and silencers

Got a job like this?

Price normally within 24 hours of drawings or survey information.

Send drawings Get a price