- Type
- Generator exhaust
- Location
- Preston, North West
- Status
- Complete
- System
- Twin wall insulated exhaust
The job
One generator, one stack.
A new exhaust for a single generator at Preston Hospital.
The stack rises from the silencer on top of the generator's acoustic enclosure.
We surveyed it, drew the route and installed it with our own supports and fixings.
1
generator
Ø350
twin wall insulated exhaust
5.15 m
stack height
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- CAD drawing of the route
- Ø350 twin wall insulated exhaust with a 90° elbow
- strut channel supports and fixings
- Our own access up to 2.5 m working height
- Certificate of conformity
Own access
We brought our own access.
Access up to 2.5 m working height was provided by us.
Project details
- Generator exhaust
- North West
- Supply and install
- Own access
Got a job like this?
Price normally within 24 hours of drawings or survey information.