- Type
- Boiler flue
- Location
- London, London
- Status
- Complete
- System
- Twin wall flue
The job
A boiler flue up the back of a London building.
A new boiler flue for a building on Charlotte Street in central London.
The flue starts in the plant room with a 45 degree tee, then runs out and up the rear wall of the building.
On the last day we fitted the drain caps, then finished the run on the roof, 1m past the roofline, with two dead weight supports and a solid bracket at the top. We smoke tested the flue and cleaned up before leaving.
1m
above the roofline
2
dead weight supports
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Twin wall flue from the plant room to the roof
- Dead weight supports and wall brackets
- Terminal 1m past the roofline
- Smoke test on completion
Finishing
The details we leave behind.
Drain caps fitted and a solid bracket at the top of the run.
Project details
- Boiler flue
- London
- Supply and install
Got a job like this?
Price normally within 24 hours of drawings or survey information.