Polished stainless flue terminal above a London rooftop under blue sky
All projects
Boiler flue GE3185

Charlotte Street

London, boiler flue

Type
Boiler flue
Location
London, London
Status
Complete
System
Twin wall flue

The job

A boiler flue up the back of a London building.

A new boiler flue for a building on Charlotte Street in central London.

The flue starts in the plant room with a 45 degree tee, then runs out and up the rear wall of the building.

On the last day we fitted the drain caps, then finished the run on the roof, 1m past the roofline, with two dead weight supports and a solid bracket at the top. We smoke tested the flue and cleaned up before leaving.

1m

above the roofline

2

dead weight supports

On site.

Site photographs. Tap a photo to see it larger.

Charlotte Street, London, boiler flue. The terminal above the roofline.
Charlotte Street, London, boiler flue. The flue runs up the rear wall.
Charlotte Street, London, boiler flue. Looking up the flue run on the wall.

Scope

What we delivered.

  • Twin wall flue from the plant room to the roof
  • Dead weight supports and wall brackets
  • Terminal 1m past the roofline
  • Smoke test on completion

Finishing

The details we leave behind.

Drain caps fitted and a solid bracket at the top of the run.

Project details

  • Boiler flue
  • London
  • Supply and install
Similar workBoiler flues

Got a job like this?

Price normally within 24 hours of drawings or survey information.

Send drawings Get a price