The job
Two boilers, one header, plant room B.
A new flue system for the two boilers in plant room B at Matthew Arnold School in Oxford.
Each boiler has a Ø200 primary flue that rises to high level. The two primaries join a Ø250 twin wall insulated header, which runs on a strut frame to the chimney.
The work was planned from our survey with a CAD drawing and a method statement, and finished with a smoke test.
2
boilers
Ø250
twin wall header
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- CAD drawing
- Risk assessment and method statement
- Ø200 primaries into a Ø250 header
- Strut frame and drop rod supports
- Smoke test
Project details
- Boiler flue
- South East
- Design, supply and install
Got a job like this?
Price normally within 24 hours of drawings or survey information.