Stainless twin wall flue header running along a plant room ceiling on drop rods and a wall bracket
All projects
Boiler flue GE1510

The Roundhouse

Birmingham, boiler flue

Type
Boiler flue
Location
Birmingham, West Midlands
Status
Complete
System
Twin wall insulated flue

The job

Two boilers, one header, up through the roof.

We designed, supplied and installed the boiler flue at The Roundhouse in Birmingham.

Two 120kW boilers connect with Ø100 primaries into a shared Ø150 header. The run has about 2.5 metres of horizontal flue before the stack rises around 8.9 metres.

The horizontal run is hung from drop rods and wall brackets in the plant room. The roof work was done from an access tower.

2 × 120kW

boilers on one header

8.9m

approximate stack height

On site.

Site photographs. Tap a photo to see it larger.

The Roundhouse, Birmingham, boiler flue. The header run in the plant room, on drop rods and a wall bracket.
The Roundhouse, Birmingham, boiler flue. Working from an access tower at roof level.

Scope

What we delivered.

  • Flue sizing and route design
  • Ø100 primaries into a Ø150 header
  • Load bearing supports and wall brackets
  • Stack up through the roof

Project details

  • Boiler flue
  • West Midlands
  • Design, supply and install