- Type
- Boiler flue
- Location
- St Helens, North West
- Status
- Complete
- System
- Twin wall insulated flue
The job
An external stack up a clad wall.
We designed, supplied and installed a new boiler flue at a delivery office in St Helens.
Two condensing gas boilers connect with Ø150 primaries into a Ø200 twin wall header inside the building.
Outside, the flue runs up the clad wall on an offset to clear the building edge, then rises clear of the roofline. The stack is about 12 metres tall.
Ø200
twin wall header
12m
approximate stack height
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Flue design
- Ø150 primaries into a Ø200 header
- Wall brackets up the external stack
- Stack taken up past the roofline
Project details
- Boiler flue
- North West
- Design, supply and install