- Type
- Boiler flue
- Location
- Worcester, West Midlands
- Status
- Complete
- System
- Twin wall insulated flue
The job
Two white stacks up a school wall.
We designed, supplied and installed new flues for the boilers and water heater at Red Hill Primary School in Worcester.
Three gas boilers connect with Ø150 primaries into a Ø200 header. The water heater has its own Ø100 flue.
Both flues run up the outside of the building, each about 8 metres tall, and are finished in white to sit against the brickwork.
3
boilers on a Ø200 header
8m
approximate height of each stack
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Flue design
- Ø150 primaries into a Ø200 boiler header
- Separate Ø100 water heater flue
- Wall bands up the external stacks
- Two external stacks above the roofline
Finishing
The details we leave behind.
Both external stacks are finished in white so they sit neatly against the school brickwork.
Project details
- Boiler flue
- West Midlands
- Design, supply and install
Got a job like this?
Price normally within 24 hours of drawings or survey information.