The job

Out through the wall and up the side.

We designed, supplied and installed a new boiler flue at a delivery office in Stoke-on-Trent.

The boiler connects with a Ø150 twin wall flue. It passes through the wall onto a base tee with a drain, then offsets out and rises about 8 metres up the outside of the building to clear the roof.

Ø150

twin wall insulated flue

8m

approximate stack height

On site.

Site photographs. Tap a photo to see it larger.

Delivery office, Stoke-on-Trent, boiler flue. Where the flue leaves the wall, with the base tee and drain.
Delivery office, Stoke-on-Trent, boiler flue. The external stack running up past the roofline.

Scope

What we delivered.

  • Flue design
  • Ø150 twin wall flue through the wall
  • Base tee with drain and wall bracket
  • External stack up past the roofline

Project details

  • Boiler flue
  • West Midlands
  • Design, supply and install