Tall stainless twin wall flue fixed to the clad wall of a hotel, rising above the roofline against a grey sky
All projects
Boiler flue GE1968

Shankly Hotel

Liverpool, boiler flue

Type
Boiler flue
Location
Liverpool, North West
Status
Complete
System
Twin wall insulated flue

The job

A 25 metre boiler flue for a city centre hotel.

We designed, supplied and installed the boiler flue for a hotel in Liverpool, fitted in spring 2023.

Two boilers connect through 250mm primaries into a 350mm twin wall header. The system runs about 5 metres horizontally with its tees and bends, then rises about 25 metres in total, finishing 3 metres above roof level.

Inside, the header passes through the roof void and out to the face of the building, where the riser is fixed to the cladding with wall brackets up to the terminal. The finished system was pressure tested.

25m

total stack height

2

boilers on one header

On site.

Site photographs. Tap a photo to see it larger.

Shankly Hotel, Liverpool, boiler flue. The external riser fixed to the building, up to the terminal.
Shankly Hotel, Liverpool, boiler flue. The flue turning through the roof space towards the outside.
Shankly Hotel, Liverpool, boiler flue. Header and tee against the old brick walls.

Scope

What we delivered.

  • Flue design and layout drawing
  • 250mm primaries into a 350mm header
  • External twin wall riser
  • Wall brackets up the building
  • Termination 3 metres above roof level
  • Pressure test

Project details

  • Boiler flue
  • North West