- Type
- Generator exhaust
- Location
- Worcester, West Midlands
- Status
- Complete
- System
- Insulated generator flue, 150mm
The job
Exhaust flues for a row of data centre generators.
We designed, supplied and installed the exhaust flues for nine standby generators at a data centre in Worcester in 2022.
Each generator has its own 150mm insulated flue rising about 3 metres above its canopy. We surveyed the site, drew the layout and supplied all the strut and fixings.
Each flue is held in a frame of back to back strut with a cross brace, fixed to the top of the generator canopy, and finishes with a 90 degree elbow terminal.
9
generator flues
150mm
insulated flue
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- CAD layout drawing
- Insulated generator exhaust flues
- Strut support frames with cross bracing
- Elbow terminals
- Job specific RAMS
Project details
- Generator exhaust
- West Midlands
- Design, supply and install