- Type
- Boiler flue
- Location
- Leicester, East Midlands
- Status
- Complete
- System
- Single wall stainless flue
The job
Two boilers on a shared header.
We designed, supplied and installed a new flue for two 240kW boilers at a government office in Leicester in April 2022.
Each boiler has a Ø200 primary that joins a Ø250 header in the plant room. The flue then rises through the roof and turns to finish on its own support frame.
The system is single wall stainless steel, held on strut supports, and was signed off with a certificate of conformity.
2 × 240kW
boilers on one header
Ø250
combined header
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- Flue calculations and CAD drawing
- Ø200 primaries into a Ø250 header
- Strut supports in the plant room and on the roof
- Roof terminal with mesh guard
- Certificate of conformity
Project details
- Boiler flue
- East Midlands
- Design, supply and install