Scaffold built up the side of a brick school building to reach the top of a tall brick chimney
All projects
Boiler flue GE2400

Tillington Manor Primary School

Stafford, boiler flue

Type
Boiler flue
Location
Stafford, West Midlands
Status
Complete
System
Twin wall condensing flue

The job

Two boilers, one old school chimney.

We designed, supplied and installed the flues for two 150kW boilers at Tillington Manor Primary School in Stafford.

Each boiler has a Ø150 stainless primary that joins the run across the plant room. The flue then rises about 8 metres inside the school's existing brick chimney, which we reached from a scaffold built up the side of the building.

We drew the route in CAD before the install and fitted it with our own fixings and supports.

2 × 150kW

boilers

8m

approximate riser height

On site.

Site photographs. Tap a photo to see it larger.

Tillington Manor Primary School, Stafford, boiler flue. Scaffold up to the chimney the flue runs inside.
Tillington Manor Primary School, Stafford, boiler flue. The boiler connections in the plant room.

Scope

What we delivered.

  • Site survey
  • Flue calculations and CAD layout
  • Job specific RAMS
  • Ø150 stainless boiler primaries
  • Riser inside the existing brick chimney
  • Fixings and supports throughout

Project details

  • Boiler flue
  • West Midlands
  • Design, supply and install
Similar workBoiler flues

Got a job like this?

Price normally within 24 hours of drawings or survey information.

Send drawings Get a price