Stainless twin wall flue rising from the back of a large steam boiler and running along the wall at high level
All projects
Steam boiler flue GE2473

Commercial site

Preston, steam boiler flue

Type
Boiler flue
Location
Preston, North West
Status
Complete
System
Twin wall insulated flue

The job

A steam boiler flue out through the wall.

We designed, supplied and installed the flue for a steam boiler at a commercial site in Preston in August 2022.

The Ø300 twin wall insulated flue rises off the back of the boiler, runs about 4.5 metres at high level and exits through the side wall.

Outside, it rises up the cladding on wall brackets to finish 1 metre above the eaves. We fitted the flashing plate where it passes through the wall.

Ø300

twin wall insulated flue

1m

terminal height above the eaves

On site.

Site photographs. Tap a photo to see it larger.

Commercial site, Preston, steam boiler flue. The flue leaving the steam boiler.
Commercial site, Preston, steam boiler flue. The flue rising up the outside wall.

Scope

What we delivered.

  • Site survey
  • Calculations and CAD drawing
  • Job specific RAMS
  • Ø300 twin wall flue from the boiler
  • Wall brackets up the cladding
  • Flashing plate at the wall exit
  • Certificate of conformity and O&M documents

Finishing

The details we leave behind.

Flashing plate fitted where the flue passes out through the cladding.

Project details

  • Boiler flue
  • North West
  • Design, supply and install
Similar workBoiler flues

Got a job like this?

Price normally within 24 hours of drawings or survey information.

Send drawings Get a price