- Type
- Boiler flue
- Location
- Preston, North West
- Status
- Complete
- System
- Twin wall insulated flue
The job
A steam boiler flue out through the wall.
We designed, supplied and installed the flue for a steam boiler at a commercial site in Preston in August 2022.
The Ø300 twin wall insulated flue rises off the back of the boiler, runs about 4.5 metres at high level and exits through the side wall.
Outside, it rises up the cladding on wall brackets to finish 1 metre above the eaves. We fitted the flashing plate where it passes through the wall.
Ø300
twin wall insulated flue
1m
terminal height above the eaves
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- Calculations and CAD drawing
- Job specific RAMS
- Ø300 twin wall flue from the boiler
- Wall brackets up the cladding
- Flashing plate at the wall exit
- Certificate of conformity and O&M documents
Finishing
The details we leave behind.
Flashing plate fitted where the flue passes out through the cladding.
Project details
- Boiler flue
- North West
- Design, supply and install
Got a job like this?
Price normally within 24 hours of drawings or survey information.