- Type
- Boiler flue
- Location
- Kinver, West Midlands
- Status
- Complete
- System
- Single wall stainless flue
The job
New boiler flues for a school plant room.
We designed, supplied and installed the boiler flue system at Kinver High School in November 2022.
Each boiler has a Ø150 primary. The primaries rise and join a header at high level in the brick plant room.
From there the flue rises about 15 metres in single wall stainless steel and finishes above the roof on a flashing plate with a storm collar and mesh guard.
Ø150
boiler primaries
15m
approximate stack height
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- Flue calculations and CAD drawing
- Ø150 primaries into a high level header
- Strut supports and fixings
- Flashing plate, storm collar and mesh terminal
- Job specific RAMS
Finishing
The details we leave behind.
Flashing plate, storm collar and mesh guard at the roof terminal.
Project details
- Boiler flue
- West Midlands
- Design, supply and install