The job
Two boilers into the school chimney.
We designed, supplied and installed the flues for two 120kW boilers at Landywood Primary School in Great Wyrley in August 2022.
Each boiler has a Ø100 primary with a tee and drain point. The run crosses the plant room ceiling and turns into the old brick chimney breast.
Inside the chimney the stainless flue rises about 12 metres and finishes with a terminal on top of the stack.
2 × 120kW
boilers
12m
approximate stack height
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- Flue calculations and CAD drawing
- Job specific RAMS
- Ø100 boiler primaries with tees and drains
- Flue run up the existing brick chimney
- Terminal on the chimney top
- Certificate of conformity and O&M documents