The job
Three boiler flues, replaced in two phases.
New twin wall flues for three boilers on the roof at DVLA in Swansea.
We took the old flues out and fitted the new ones in two phases, so the boilers could keep running.
The flues are held in steel frames on feet that sit on the roof without going through it.
Smoke tested on completion.
3
boilers
Ø500
internal flue diameter
2
phases, boilers kept running
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey and flue drawings
- Old flues taken out in two phases
- Scaffold supplied, put up and taken down
- Twin wall insulated flues, Ø500 inside
- Steel support frames on non-penetrating roof feet
- New flashings at roof level
- Test points, inspection tees at the base and a smoke test
- Certificate of conformity
Own access
We brought our own access.
We supplied our own scaffold, put it up and took it down at the end.
Project details
- Boiler flue
- Wales
- Supply and install
- Own access
Got a job like this?
Price normally within 24 hours of drawings or survey information.