- Type
- Generator exhaust
- Location
- Greenwich, London
- Status
- Complete
- System
- Insulated twin wall exhaust
The job
An exhaust extension for a caged generator.
We designed, supplied and installed an exhaust flue extension for a 187kW standby generator at Creek Road in June 2023.
The insulated twin wall flue, Ø150 inside, runs about 6.5 metres at high level under the plant deck on strut supports.
It turns through a 90° and a 45° elbow and finishes on a horizontal terminal that discharges through the security mesh of the generator compound.
187kW
standby generator
6.5m
approximate horizontal run
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- Calculations and CAD drawing
- Insulated twin wall exhaust, Ø150
- Strut supports under the plant deck
- Horizontal terminal through the compound mesh
- Certificate of conformity
Project details
- Generator exhaust
- London
- Design, supply and install