The job
A new boiler flue for a Lichfield primary school.
We designed, supplied and installed a new boiler flue system at a primary school in Lichfield.
Three 100kW boilers connect through Ø100 primary flues into a Ø180 twin wall insulated header. The flue rises about 8 metres, with only about half a metre of horizontal run.
We surveyed the old plant room first. The photos here are from that survey and show the existing boilers and flue before the work.
3 × 100kW
boilers on one header
8m
flue height
On site.
Survey photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey of the existing plant room
- Flue calculations and CAD drawing
- Job specific RAMS
- Ø180 twin wall header and Ø100 primary flues
Project details
- Boiler flue
- West Midlands
- Design, supply and install