The job

A new boiler flue for a Lichfield primary school.

We designed, supplied and installed a new boiler flue system at a primary school in Lichfield.

Three 100kW boilers connect through Ø100 primary flues into a Ø180 twin wall insulated header. The flue rises about 8 metres, with only about half a metre of horizontal run.

We surveyed the old plant room first. The photos here are from that survey and show the existing boilers and flue before the work.

3 × 100kW

boilers on one header

8m

flue height

On site.

Survey photographs. Tap a photo to see it larger.

Survey photo. Christ Church Primary School, Lichfield, boiler flue. Survey photo: the old header before the work.
Survey photo. Christ Church Primary School, Lichfield, boiler flue. Survey photo: the existing boilers and flue connections.

Scope

What we delivered.

  • Site survey of the existing plant room
  • Flue calculations and CAD drawing
  • Job specific RAMS
  • Ø180 twin wall header and Ø100 primary flues

Project details

  • Boiler flue
  • West Midlands
  • Design, supply and install