- Type
- Boiler flue
- Location
- Nuneaton, West Midlands
- Status
- Complete
- System
- Twin wall insulated flue
The job
A water heater flue for a distribution centre.
We designed, supplied and installed a new water heater flue at a distribution centre in Nuneaton.
A single 71kW water heater connects to a Ø130 twin wall insulated flue. The flue has about 7 metres of horizontal run at high level and rises about 7 metres, past a mezzanine floor, to a terminal on the profiled metal roof.
A drain tee sits at the base of the riser to take condensate away.
Ø130
twin wall flue
7m
horizontal run
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- CAD drawing
- Twin wall flue at high level
- Strut and drop rod supports
- Roof terminal and flashing
- Certificate of conformity