- Type
- Boiler flue
- Location
- Hayes, London
- Status
- Complete
- System
- Twin wall insulated flue
The job
New flues for a school's replacement boilers.
We designed, supplied and installed the flue system for two new condensing boilers at a school in Hayes.
Each boiler has a Ø250 primary flue into a Ø300 twin wall insulated header. The header runs about 3.4 metres with a 90 degree elbow, then the flue rises about 9 metres up the outside of the building.
The photos are from our survey of the old boiler house and flue before the work.
2
boilers on one header
Ø300
twin wall header
On site.
Survey photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- Flue calculation and CAD drawing
- Job specific RAMS
- Ø250 primaries and Ø300 header
- Wall brackets up the riser
- O&M documents
Project details
- Boiler flue
- London
- Design, supply and install
Got a job like this?
Price normally within 24 hours of drawings or survey information.