- Type
- Boiler flue
- Location
- Malvern, West Midlands
- Status
- Complete
- System
- Twin wall insulated flue
The job
A new vertical flue on the back of a theatre.
We supplied and installed a new vertical section of boiler flue on the back wall of Malvern Theatres.
Two condensing boilers share a Ø400 flue. It rakes up the wall from the plant room to a base tee on strut brackets, then rises about 8.5 to 9 metres to above the roof line.
The photos are from before the work and show the existing flue route on the wall.
Ø400
twin wall flue
9m
vertical section
On site.
Survey photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- CAD drawing
- Ø400 twin wall vertical section
- Strut brackets fixed to the wall
- Terminal above the roof line
Project details
- Boiler flue
- West Midlands
- Supply and install