- Type
- Boiler flue
- Location
- Heathrow, London
- Status
- Complete
- System
- Twin wall insulated flue
The job
Boiler connections into one stack.
New flue connections for the boiler plant at Hilton Garden Inn, Heathrow.
We ran both legs from the vertical stack back to the boilers, each with its own bracket.
At roof level the terminal is finished with a storm collar, sealed all the way round.
Ø250
and Ø300 twin wall insulated flue
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- Twin wall insulated flue, Ø250 and Ø300
- Both boiler legs bracketed back to the stack
- Roof terminal with a sealed storm collar
- Certificate of conformity
Finishing
The details we leave behind.
Storm collar sealed all the way round. Strut ends capped, rods cut and capped, and the site left tidy.
Project details
- Boiler flue
- London
- Supply and install