The job
Four oven flues through a factory roof.
Separate flues for four ovens in the PTF building at a factory site in Derby.
Each flue rises straight up through the roof and finishes with a horizontal bird beak terminal with mesh.
4
ovens
Ø150
twin wall insulated flues
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- CAD drawing
- Four Ø150 twin wall insulated flues
- Bird beak terminals with mesh
- strut channel supports and fixings
- Certificate of conformity
Project details
- Process exhaust
- East Midlands
- Supply and install
Got a job like this?
Price normally within 24 hours of drawings or survey information.