The job
Extending a boiler flue on a rooftop plant deck.
A flue modification for the extension at Highgate Community Centre in north London.
The flue serves three 120kW boilers. We extended it in twin wall insulated flue up the side of the rooftop plant enclosure.
The work was done in November 2024 and signed off with a certificate of conformity.
3
boilers, 120kW each
Ø200
twin wall flue
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Twin wall insulated flue extension
- strut channel wall brackets with capped rods
- Storm collar sealed at the top
- Certificate of conformity
Finishing
The details we leave behind.
Storm collar sealed with silicone, rods cut and capped, strut channel ends capped and the site left tidy.
Project details
- Boiler flue
- London