- Type
- Generator exhaust
- Location
- Applecross, Scotland
- Status
- Complete
- System
- Generator exhaust
The job
Extra works on a generator exhaust.
A return visit to the generator exhausts at Applecross.
We fitted two elbows onto a generator flue, cut to suit, sealed the V band joints and wrapped lagging around all eight elbow sections.
The order also covered flange adaptors for the connections.
2
elbows fitted
8
elbow sections lagged
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Two elbows fitted to the generator flue
- V band joints, sealed
- Lagging on all eight elbow sections
- Flange adaptors
Project details
- Generator exhaust
- Scotland
- Supply and install
Got a job like this?
Price normally within 24 hours of drawings or survey information.