The job
A new header in Building 3.
New flues for two 120 kW boilers and a water heater in Building 3 at Reading Hospital.
A twin wall insulated header with tees sits above the boilers and ties into the riser.
Ø150 boiler primaries into a Ø250 header, a Ø130 water heater flue, and the old flues taken out.
2
120 kW boilers
1
water heater
Ø250
header
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- CAD drawing
- Old flues taken out
- Ø150 boiler primaries into a Ø250 header
- Ø130 water heater flue
- Bespoke tees
- New flashings
Project details
- Boiler flue
- South East
- Supply and install