New stainless twin wall header with tees above boilers, connected to the existing riser
All projects
Boiler and water heater flues GE4023

Reading Hospital Building 3

Reading, boiler and water heater flues

Type
Boiler flue
Location
Reading, South East
Status
Complete
System
Twin wall insulated flue

The job

A new header in Building 3.

New flues for two 120 kW boilers and a water heater in Building 3 at Reading Hospital.

A twin wall insulated header with tees sits above the boilers and ties into the riser.

Ø150 boiler primaries into a Ø250 header, a Ø130 water heater flue, and the old flues taken out.

2

120 kW boilers

1

water heater

Ø250

header

On site.

Site photographs. Tap a photo to see it larger.

Reading Hospital Building 3, Reading, boiler and water heater flues. New twin wall header with tees above the boilers, tied into the riser.

Scope

What we delivered.

  • Site survey
  • CAD drawing
  • Old flues taken out
  • Ø150 boiler primaries into a Ø250 header
  • Ø130 water heater flue
  • Bespoke tees
  • New flashings

Project details

  • Boiler flue
  • South East
  • Supply and install