Two stainless flue risers up the side of a brick building beside the existing stack
All projects
Boiler flues GE4033

RAF Marham B562

Marham, boiler flues

Type
Boiler flue
Location
Marham, East of England
Status
Complete
System
Twin wall insulated flue

The job

Old flue out, new flues in.

New flues for two 620 kW boilers in building B562 at RAF Marham, with the old flue taken out and disposed of.

Twin wall insulated flue, Ø300 inside, with two risers on brackets up the side of the building.

2

620 kW boilers

Ø300

twin wall insulated flue

On site.

Site photographs. Tap a photo to see it larger.

RAF Marham B562, Marham, boiler flues. Two risers on brackets up the side of the building, beside the old stack.

Scope

What we delivered.

  • Site survey
  • CAD drawing
  • Old flue taken out and disposed of
  • Ø300 twin wall insulated flues
  • Wall brackets up the building

Project details

  • Boiler flue
  • East of England
  • Supply and install
Similar workBoiler flues

Got a job like this?

Price normally within 24 hours of drawings or survey information.

Send drawings Get a price