New stainless twin wall flue on a floor support frame rising from an air handling unit
All projects
Air handling unit flue GE4053

Rolls-Royce Rotatives

Derby, air handling unit flue

Type
Process exhaust
Location
Derby, East Midlands
Status
Complete
System
Twin wall insulated flue

The job

A flue for an air handling unit.

A new Ø350 twin wall insulated flue for an air handling unit at a factory site in Derby, with the old one stripped out.

It rises from the unit on a floor-standing support frame.

Ø350

twin wall insulated flue

On site.

Site photographs. Tap a photo to see it larger.

Rolls-Royce Rotatives, Derby, air handling unit flue. Floor-standing frame under the flue rising from the air handling unit.

Scope

What we delivered.

  • Site survey
  • CAD drawing
  • Old flue stripped out
  • Ø350 twin wall insulated flue
  • Floor-standing support frame
  • Certificate of conformity

Project details

  • Process exhaust
  • East Midlands
  • Supply and install
Similar workProcess exhaust

Got a job like this?

Price normally within 24 hours of drawings or survey information.

Send drawings Get a price