- Type
- Chimney liner
- Location
- Oxford, South East
- Status
- Complete
- System
- Twin wall insulated flue, flexible chimney liner
The job
Two new boilers into an old concrete chimney.
A new boiler flue and chimney liner for the main boiler plant room at Matthew Arnold School in Oxford.
At survey, the old boiler flues ran up into a concrete chimney inside the plant room.
A Ø250 flexible stainless liner now runs inside the chimney, with a new terminal at the top. Twin wall insulated flue connects it to the two new boilers.
We smoke tested the system on 6 August 2026. The smoke left at the top with no visible leaks, and we issued a certificate of conformity.
2
boilers
Ø250
flexible chimney liner
On site.
Site and survey photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- CAD drawing
- Twin wall insulated flue from the boilers to the chimney
- Ø250 flexible liner inside the existing chimney
- Top stub with mesh and storm collar
- Smoke test and certificate of conformity
Project details
- Chimney liner
- South East
- Design, supply and install