The job

Two new boilers into an old concrete chimney.

A new boiler flue and chimney liner for the main boiler plant room at Matthew Arnold School in Oxford.

At survey, the old boiler flues ran up into a concrete chimney inside the plant room.

A Ø250 flexible stainless liner now runs inside the chimney, with a new terminal at the top. Twin wall insulated flue connects it to the two new boilers.

We smoke tested the system on 6 August 2026. The smoke left at the top with no visible leaks, and we issued a certificate of conformity.

2

boilers

Ø250

flexible chimney liner

On site.

Site and survey photographs. Tap a photo to see it larger.

Matthew Arnold School, Oxford, boiler flue and chimney liner. The new terminal at the top of the chimney.
Matthew Arnold School, Oxford, boiler flue and chimney liner. The flue entering the side of the chimney.
Matthew Arnold School, Oxford, boiler flue and chimney liner. The flue turning into the chimney inside the plant room.
Survey photo. Matthew Arnold School, Oxford, boiler flue and chimney liner. The chimney before the works.
Survey photo. Matthew Arnold School, Oxford, boiler flue and chimney liner. The old flues running into the chimney.

Scope

What we delivered.

  • Site survey
  • CAD drawing
  • Twin wall insulated flue from the boilers to the chimney
  • Ø250 flexible liner inside the existing chimney
  • Top stub with mesh and storm collar
  • Smoke test and certificate of conformity

Project details

  • Chimney liner
  • South East
  • Design, supply and install
Similar workChimneys and liners

Got a job like this?

Price normally within 24 hours of drawings or survey information.

Send drawings Get a price