- Type
- Boiler flue
- Location
- London, London
- Status
- Complete
- System
- Twin wall flue
The job
A boiler flue up a new building in Silvertown.
A boiler flue riser for block B at 3 Thames Road in Silvertown, east London.
On the first day we set the dead weight plate in the plant room and built the riser up to the fourth floor, with a bracket on every level.
Two days later we finished the roof with the last metre of flue, the top stub and a high level bracket. Then we fitted the flue kits to the boilers, worked back with a drain tee and brackets, made the boiler connections and smoke tested the system.
4th
floor reached on day one
1
bracket on every floor
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Dead weight plate at the base
- Twin wall riser to the roof
- Top stub and high level bracket on the roof
- Boiler connections with a drain tee
- Smoke test on completion
Project details
- Boiler flue
- London
- Supply and install
Got a job like this?
Price normally within 24 hours of drawings or survey information.