- Type
- Boiler flue
- Location
- Prestwick, Scotland
- Status
- Complete
- System
- Twin wall flue
The job
An old cast steel flue swapped for twin wall.
A flue replacement in the boiler house at HMS Gannet, at Prestwick airfield in Scotland.
We cut out the old cast steel flue and put in a new twin wall system in its place, through the wall and into the existing steel stack.
Closure plates and storm collars were fitted, and the job was finished in one day on 12 May 2026.
1
day on site
100%
complete, 12 May 2026
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Old cast steel flue cut out
- New twin wall flue system
- Closure plates and storm collars
- Brackets
Finishing
The details we leave behind.
Closure plates and storm collars where the flue passes through the building.
Project details
- Boiler flue
- Scotland
- Supply and install
Got a job like this?
Price normally within 24 hours of drawings or survey information.