Crematorium flue termination and roof interface detail
All projects
Crematorium flues GE4171

Thorncliffe Crematorium

Barrow-in-Furness, crematorium flues

Type
Industrial chimney
Location
Barrow-in-Furness, North West
Status
On site
System
Insulated stainless stacks

The job

Crematorium stacks on a purpose-built frame.

New flues for the cremators at Thorncliffe Crematorium in Barrow-in-Furness.

The stacks stand on a frame made from 2 inch box section, prefabricated off site and dropped into position, on feet that sit on the roof.

A lifting plan covered getting it all into place.

2

stacks

On site.

Site photographs. Tap a photo to see it larger.

Thorncliffe Crematorium, Barrow-in-Furness, crematorium flues. Stack termination and roof interface.
Thorncliffe Crematorium, Barrow-in-Furness, crematorium flues. Finished stack with its weathering plate on the flat roof.
Thorncliffe Crematorium, Barrow-in-Furness, crematorium flues. Two stacks on support plates, with the horizontal runs feeding in.
Thorncliffe Crematorium, Barrow-in-Furness, crematorium flues. Roof route with the elbow and stacks beside the old brick chimney.

Scope

What we delivered.

  • Site survey
  • CAD drawing
  • Prefabricated box section frame
  • Non-penetrating roof feet
  • Installation RAMS and lifting plan
  • Support plates, strut channel and trim plates

Finishing

The details we leave behind.

Trim plates fitted to the strut channel, and a weathering plate where the stack meets the roof.

Project details

  • Industrial chimney
  • North West
  • Supply and install
Similar workIndustrial chimneys and stacks

Got a job like this?

Price normally within 24 hours of drawings or survey information.

Send drawings Get a price