- Type
- Boiler flue
- Location
- Wantage, South East
- Status
- Complete
- System
- Single wall stainless flue
The job
A new flue sleeved inside the old one.
A new boiler flue for three condensing boilers at Wantage CE Primary School in Oxfordshire.
Each boiler connects at its Ø100 spigot with an 87 degree elbow into a common Ø180 header along the plant room wall. The header feeds a Ø180 riser on a dead weight plate.
The riser runs up inside the old flue, which we kept as a sleeve, to an open terminal above the roof. A storm collar closes the top of the old pipe. Drains sit at the end of the header and the base of the riser. It was all done in one day on 30 September 2026.
3
condensing boilers
Ø180
header and riser
1
day on site
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Ø100 boiler connections into a Ø180 header
- Riser on a dead weight plate
- Riser sleeved inside the old flue
- Open terminal and storm collar above the roof
- Drains at the header end and riser base
- O&M and handover pack
Finishing
The details we leave behind.
A storm collar closes the top of the old flue around the new riser.
Project details
- Boiler flue
- South East
- Supply and install