Stainless flue header with three boiler drops and a support bracket in a primary school plantroom
All projects
Boiler flue GE4309

Wantage CE Primary

Wantage, boiler flue

Type
Boiler flue
Location
Wantage, South East
Status
Complete
System
Single wall stainless flue

The job

A new flue sleeved inside the old one.

A new boiler flue for three condensing boilers at Wantage CE Primary School in Oxfordshire.

Each boiler connects at its Ø100 spigot with an 87 degree elbow into a common Ø180 header along the plant room wall. The header feeds a Ø180 riser on a dead weight plate.

The riser runs up inside the old flue, which we kept as a sleeve, to an open terminal above the roof. A storm collar closes the top of the old pipe. Drains sit at the end of the header and the base of the riser. It was all done in one day on 30 September 2026.

3

condensing boilers

Ø180

header and riser

1

day on site

On site.

Site photographs. Tap a photo to see it larger.

Wantage CE Primary, Wantage, boiler flue. The header with its three boiler drops.
Wantage CE Primary, Wantage, boiler flue. The terminal and storm collar above the roof.

Scope

What we delivered.

  • Ø100 boiler connections into a Ø180 header
  • Riser on a dead weight plate
  • Riser sleeved inside the old flue
  • Open terminal and storm collar above the roof
  • Drains at the header end and riser base
  • O&M and handover pack

Finishing

The details we leave behind.

A storm collar closes the top of the old flue around the new riser.

Project details

  • Boiler flue
  • South East
  • Supply and install