New stainless twin wall flue riser with offset passing up through a school plantroom ceiling
All projects
Boiler flue headers GE4333

Valley Academy

Worksop, boiler flue headers

Type
Boiler flue
Location
Worksop, Yorkshire
Status
On site
System
Twin wall flue

The job

Connecting two boilers to the headers.

Boiler flue work at Valley Academy in Worksop.

We connected two boilers to the headers. The existing twin wall header wasn't level or sealed, so we re-set it level and added a seal.

The new riser has an offset and passes up through the plant room ceiling.

2

boilers connected

On site.

Site photographs. Tap a photo to see it larger.

Valley Academy, Worksop, boiler flue headers. Riser with an offset, passing up through the plant room ceiling.

Scope

What we delivered.

  • Two boilers connected to the headers
  • Existing header re-levelled and sealed
  • Twin wall riser with an offset

Project details

  • Boiler flue
  • Yorkshire
  • Supply and install
Similar workBoiler flues

Got a job like this?

Price normally within 24 hours of drawings or survey information.

Send drawings Get a price