- Type
- Boiler flue
- Location
- Worksop, Yorkshire
- Status
- On site
- System
- Twin wall flue
The job
Connecting two boilers to the headers.
Boiler flue work at Valley Academy in Worksop.
We connected two boilers to the headers. The existing twin wall header wasn't level or sealed, so we re-set it level and added a seal.
The new riser has an offset and passes up through the plant room ceiling.
2
boilers connected
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Two boilers connected to the headers
- Existing header re-levelled and sealed
- Twin wall riser with an offset
Project details
- Boiler flue
- Yorkshire
- Supply and install
Got a job like this?
Price normally within 24 hours of drawings or survey information.