Brick building under scaffold seen from a courtyard, taken at the site survey
All projects
Generator exhaust GE1573 Survey photo

Generator installation

Leeds, generator exhaust

Type
Generator exhaust
Location
Leeds, Yorkshire
Status
Complete
System
Twin wall insulated exhaust flue

The job

An exhaust flue for a standby generator.

We designed, supplied and installed the exhaust flue for a 100kVA standby generator in Leeds.

The exhaust runs about 8 metres horizontally in twin wall insulated flue, Ø130 inside with 50mm of insulation, then rises about 3 metres to discharge.

100kVA

standby generator

8m

approximate horizontal run

On site.

Survey photographs. Tap a photo to see it larger.

Survey photo. Generator installation, Leeds, generator exhaust. The building during the site survey.

Scope

What we delivered.

  • Site survey
  • Flue design
  • Ø130 twin wall insulated exhaust
  • Vertical discharge

Project details

  • Generator exhaust
  • Yorkshire
  • Design, supply and install
Similar workGenerator exhausts and silencers

Got a job like this?

Price normally within 24 hours of drawings or survey information.

Send drawings Get a price