- Type
- Generator exhaust
- Location
- Leeds, Yorkshire
- Status
- Complete
- System
- Twin wall insulated exhaust flue
The job
An exhaust flue for a standby generator.
We designed, supplied and installed the exhaust flue for a 100kVA standby generator in Leeds.
The exhaust runs about 8 metres horizontally in twin wall insulated flue, Ø130 inside with 50mm of insulation, then rises about 3 metres to discharge.
100kVA
standby generator
8m
approximate horizontal run
On site.
Survey photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- Flue design
- Ø130 twin wall insulated exhaust
- Vertical discharge
Project details
- Generator exhaust
- Yorkshire
- Design, supply and install
Got a job like this?
Price normally within 24 hours of drawings or survey information.