The job
A shared flue for three boilers.
We designed, supplied and installed the flue system for three gas condensing boilers at No.1 Creekside in Deptford, London, in October 2022.
Each 100kW boiler connects into a shared Ø180 insulated twin wall header at high level in the plant room. The header turns into a riser that runs up through the building in its own shaft.
The system was smoke tested and passed, and was signed off with a certificate of conformity in January 2023.
3
gas boilers served
100kW
each boiler
Ø180
shared insulated header
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- Flue calculations and CAD drawing
- Job specific RAMS
- Ø180 insulated twin wall header and riser
- Supports and fixings
- Smoke test, passed
- Certificate of conformity and O&M documents
Project details
- Boiler flue
- London
- Design, supply and install