The job
A 55 metre generator exhaust to the roof.
We designed, supplied and installed the exhaust flue for a standby generator at a new building on Blossom Street in Shoreditch, finished in April 2023.
The flue is twin wall with 50mm of insulation. It runs about 8 metres across from the generator and rises about 45 metres up the building, around 55 metres of flue in total. We provided all the internal access and fitted the cover plates.
The whole system was pressure tested to 3,000 pascals for 15 minutes before handover. The measured leakage was about a third of the allowed rate, so it passed.
55m
of flue in total
15 min
pressure test, passed
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Flue design
- Twin wall insulated generator exhaust
- Wall brackets and support plates
- Roof terminal
- Internal access provided by us
- Pressure test and certificate