The job
New boiler flues along the old route.
We supplied and installed a new flue system for two new 100kW boilers at Isle Court in Shrewsbury in November 2022.
The old system was taken out and the new one follows the same route. Ø100 primaries join a Ø150 header that runs along the plant room ceiling and out over the doorway.
Outside, the twin wall flue rises up the brick face to the chimney stack, reached by cherry picker.
2 × 100kW
boilers
11m
approximate stack height
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Old flue system removed
- Ø100 primaries into a Ø150 header
- Supports and fixings
- Cherry picker to reach the stack
- Job specific RAMS
- Certificate of conformity and O&M documents
Own access
We brought our own access.
We brought a cherry picker to reach the chimney stack.