Looking into a service riser lined with block walls, with existing stainless flue, drainage pipes and steel grating
All projects
Generator exhaust GE2748 Survey photo

Lantern Building

73 Hampstead Road, generator exhaust

Type
Generator exhaust
Location
73 Hampstead Road, London
Status
Complete
System
Twin wall insulated exhaust

The job

A generator exhaust up a 35 metre riser.

We designed, supplied and installed the exhaust flue for a 150kVA standby generator at the Lantern Building, 73 Hampstead Road, London, in 2023.

The twin wall insulated flue, Ø125 inside, runs about 5 metres from the generator and then rises about 35 metres up a service riser.

We surveyed the riser in September 2023 and drew the route in CAD before the install, with a technical submittal and job specific RAMS.

150kVA

standby generator

35m

approximate rise up the riser

On site.

Survey photographs. Tap a photo to see it larger.

Survey photo. Lantern Building, 73 Hampstead Road, generator exhaust. The service riser during the survey.

Scope

What we delivered.

  • Riser survey
  • Calculations and CAD drawing
  • Technical submittal
  • Job specific RAMS
  • Twin wall insulated exhaust, Ø125
  • Strut supports up the riser

Project details

  • Generator exhaust
  • London
  • Design, supply and install
Similar workGenerator exhausts and silencers

Got a job like this?

Price normally within 24 hours of drawings or survey information.

Send drawings Get a price