The job
New seals for four boiler flue risers.
We took apart the four boiler flue systems in a residential block in Highgate and rebuilt them with new seals.
Thirteen boilers feed the four systems. Two risers are about 19 metres tall and two about 14.5 metres. The primary flue to each boiler was included, and the existing stabilisers were kept.
Each flue system was pressure tested and given its own test certificate.
4
flue systems rebuilt
13
boilers served
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- CAD drawing from the survey
- Flues taken apart
- Rebuilt with new seals, including primary flues
- Pressure test and certificate for each system