- Type
- Boiler flue
- Location
- Birmingham, West Midlands
- Status
- Complete
- System
- Twin wall insulated flue
The job
A new boiler flue for a primary school.
We designed, supplied and installed a new flue system for the boiler room at a primary school in Castle Vale, Birmingham.
Four wall hung boilers connect into a shared stainless header. The header runs through the roof void to an open terminal above the roof.
The work ran from a site survey to a CAD drawing, then installation and a certificate of conformity.
4
boilers on one header
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- CAD drawing
- Shared header and primary flues
- Strut and drop rod supports
- Open terminal above the roof
- Certificate of conformity and O&M documents
Project details
- Boiler flue
- West Midlands
- Design, supply and install
Got a job like this?
Price normally within 24 hours of drawings or survey information.