The job
A replacement boiler header in Cambridge.
We designed, supplied and installed a replacement horizontal flue header in a Cambridge plant room.
Four 425kW boilers connect through Ø250 primary flues into a Ø450 twin wall insulated header. The header runs about 8 metres with several offsets to get around the plant and services.
4 × 425kW
boilers on one header
Ø450
twin wall header
On site.
Site photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- CAD drawing
- Ø450 header and Ø250 primary flues
- Strut supports at high level
Project details
- Boiler flue
- East of England
- Design, supply and install
Got a job like this?
Price normally within 24 hours of drawings or survey information.