Boiler flue header GE2794

Hutchinson Building

Cambridge, boiler flue header

Type
Boiler flue
Location
Cambridge, East of England
Status
Complete
System
Twin wall insulated flue

The job

A replacement boiler header in Cambridge.

We designed, supplied and installed a replacement horizontal flue header in a Cambridge plant room.

Four 425kW boilers connect through Ø250 primary flues into a Ø450 twin wall insulated header. The header runs about 8 metres with several offsets to get around the plant and services.

4 × 425kW

boilers on one header

Ø450

twin wall header

On site.

Site photographs. Tap a photo to see it larger.

Hutchinson Building, Cambridge, boiler flue header. The new header at high level.

Scope

What we delivered.

  • Site survey
  • CAD drawing
  • Ø450 header and Ø250 primary flues
  • Strut supports at high level

Project details

  • Boiler flue
  • East of England
  • Design, supply and install