Boiler flue and chimney liner GE2874

Carrington Primary School

Nottingham, boiler flue and chimney liner

Type
Chimney liner
Location
Nottingham, East Midlands
Status
Complete
System
Twin wall header and flexible liner

The job

A new header and liner for a Nottingham school.

We designed, supplied and installed a new boiler flue at a primary school in Nottingham, using the existing chimney.

Two 115kW condensing boilers rise on Ø100 primaries into a Ø130 twin wall insulated header. The header runs about 2 metres to a base elbow and drain inside the chimney opening.

From there a Ø130 stainless steel flexible liner rises about 6 metres up the chimney to the terminal.

2 × 115kW

boilers on one header

6m

chimney liner

On site.

Site photographs. Tap a photo to see it larger.

Carrington Primary School, Nottingham, boiler flue and chimney liner. Both boilers joining the header, which runs into the chimney opening.
Carrington Primary School, Nottingham, boiler flue and chimney liner. Flue runs at high level in the boiler room.

Scope

What we delivered.

  • Site survey
  • Flue calculation and CAD drawing
  • Job specific RAMS
  • Ø130 twin wall header with base elbow and drain
  • Ø130 flexible liner up the existing chimney
  • Certificate of conformity and O&M documents

Project details

  • Chimney liner
  • East Midlands
  • Design, supply and install