Stainless boiler flues with offsets and a drain section in a plant room
All projects
Boiler flues GE3149

Givaudan

Ashford, boiler flues

Type
Boiler flue
Location
Ashford, East of England
Status
Complete
System
Single wall stainless flue

The job

Two boiler flues, old out and new in.

Replacement flues for two modular boilers at Givaudan in Ashford.

We put up a scaffold tower, took the old system out and connected the new flues to the boilers.

Under the old flue we found a second roof it had been weathered through. We then weathered the new flues at the roof.

2

modular boilers

Ø250

single wall stainless flue

On site.

Site photographs. Tap a photo to see it larger.

Givaudan, Ashford, boiler flues. Flues with offsets and a drain section at the low point.
Givaudan, Ashford, boiler flues. Terminals with storm collars and new weathering on the roof.

Scope

What we delivered.

  • Scaffold tower for access
  • Old flue system taken out
  • Two Ø250 single wall flues with offsets and a drain section
  • Weathering at the roof with storm collars
  • Certificate of conformity

Finishing

The details we leave behind.

Storm collars and new weathering where the flues come through the roof.

Own access

We brought our own access.

We built our own scaffold tower to reach the flue.

Project details

  • Boiler flue
  • East of England
  • Supply and install
  • Own access
Similar workBoiler flues

Got a job like this?

Price normally within 24 hours of drawings or survey information.

Send drawings Get a price