The job
Boilers and water heaters in Building 8.
New flues for three 120 kW boilers and two water heaters in Building 8 at Reading Hospital.
The boilers connect on Ø150 primaries into a Ø250 header. The water heaters have their own Ø130 flues.
Twin wall insulated throughout, with bespoke tees, new flashings and the old flues taken out.
3
120 kW boilers
2
water heaters
Ø250
common header
On site.
Survey photographs. Tap a photo to see it larger.
Scope
What we delivered.
- Site survey
- CAD drawing
- Old flues taken out
- Ø150 boiler primaries into a Ø250 header
- Ø130 water heater flues
- Bespoke tees
- New flashings